The earthing/short-circuiting device set is designed for earthing and short circuiting of the flat bars, cable heads of the armoured distribution system, and transformer substations. The form of the phase clamps provides easy connection to the pre-manufactured studs, cylindrical contact pins as well as spherical studs The placing of the phase clamps must be carried out with operating rods suitable for the appropriate voltage level.

Phase clamps can be found in the set
KÖF-C-9001
KÖF-C-9004
KÖF-C-9002/1
KÖF-C-9003/1
KÖF-C-9002/2
KÖF-C-9003/2
KÖF-C-9002/3
KÖF-C-9003/3
KÖF-9006/PC
KÖF-C-9007

 

Attachment: 

Recommended products

KIF-9001

The earthing / short-circuiting device is for earthing and short-circuiting of low-voltage overhead line segment that have been disconnected for maintenance.

SZL-FRZ-B-25

The earthing / short-circuiting devices are for earthing and short-circuiting of the leads on the low voltage insulated networks, on the specified point.

VK-C-U

  • Hexagon-universal
  • Product code: 536463

ABC KIT

The ABC earthing and short-circuiting equipment is for earthing and short-circuiting of low-voltage overhead line segment that have been disconnected for maintenance.

KÖF-C-9002/1 Phase clamp

The KÖF-C-9002/1 phase clamp can be built in or can be connected to various operating rods and with cooper wire we can get an earthing/short-circuiting device.

VK-NAF-2011/RR Phase clamp

The VK-NAF-2011/RR phase clamp can be built in or can be connected to various operating rods and with copper wire we can get an earthing whip.

KN-9005/PC phase clamp

The KN-9005/PC phase clamp can be built in or can be connected to various operating rods and with copper wire we can get an earthing whip.

KÖF-C-9007 Phase clamp

The KÖF-C-9007 phase clamp can be built in or can be connected to various operating rods and with copper wire we can get an earthing/short-circuiting device.

VK-O-95-4

The VK-O-95-4 (95 mm² wire) earthing and short circuiting device is to earth and short circuit the overhead network per phase.